GC Works contracts
The suite of standard Government Conditions of contract, GC Works, is still available; however, it is no longer being updated by the government, who has moved to the New Engineering Contract, now in its fourth edition (NEC4).
The GC Works contracts were created primarily for government projects, but could be used in the private sector. They were published by the Stationery Office for the Property Advisors for the Civil Estate (PACE).
The suite of contracts comprised:
- GC Works 1: Without quantities.
- GC Works 1: With quantities.
- GC Works 1: Single-stage design and build.
- GC Works 1: Model forms and commentary.
- GC Works 1: Two-stage design and build.
- GC Works 1: Construction management trade contract with quantities.
- GC Works 1: Construction management trade contract without quantities.
- GC Works 2: Minor works.
- GC Works 3: Contract for mechanical and electrical engineering works.
- GC Works 4: Contract for building, small works.
In addition, there were a range of supporting documents such as; sub-contracts, forms of tender, invitation to tender, performance bonds, parent company guarantees, retention bonds, notices and certificates.
[edit] Related articles
- Contracts.
- Contract conditions.
- CPC2013.
- Government departments responsibility for construction.
- JCT.
- Modifying clauses in standard forms of contract.
- Minor works contract.
- NEC3.
- Procurement route.
- Sub-contract.
[edit] External references
- Fenwick Elliot: Know your contract. November 2009.
Featured articles and news
A five minute introduction.
50th Golden anniversary ECA Edmundson apprentice award
Showcasing the very best electrotechnical and engineering services for half a century.
Welsh government consults on HRBs and reg changes
Seeking feedback on a new regulatory regime and a broad range of issues.
CIOB Client Guide (2nd edition) March 2025
Free download covering statutory dutyholder roles under the Building Safety Act and much more.
AI and automation in 3D modelling and spatial design
Can almost half of design development tasks be automated?
Minister quizzed, as responsibility transfers to MHCLG and BSR publishes new building control guidance.
UK environmental regulations reform 2025
Amid wider new approaches to ensure regulators and regulation support growth.
The maintenance challenge of tenements.
BSRIA Statutory Compliance Inspection Checklist
BG80/2025 now significantly updated to include requirements related to important changes in legislation.
Shortlist for the 2025 Roofscape Design Awards
Talent and innovation showcase announcement from the trussed rafter industry.
OpenUSD possibilities: Look before you leap
Being ready for the OpenUSD solutions set to transform architecture and design.
Global Asbestos Awareness Week 2025
Highlighting the continuing threat to trades persons.
Retrofit of Buildings, a CIOB Technical Publication
Now available in Arabic and Chinese aswell as English.
The context, schemes, standards, roles and relevance of the Building Safety Act.
Retrofit 25 – What's Stopping Us?
Exhibition Opens at The Building Centre.
Types of work to existing buildings
A simple circular economy wiki breakdown with further links.
A threat to the creativity that makes London special.